Civil Engineering

Earth Movement / Stabilisation

Earth Movement / Stabilisation

Modifying terrain to prevent landslides or subsidence, ensuring a solid groundwork.

Land Drainage

Land Drainage

Implementing systems to remove excess water, preventing water-logging and soil erosion.

Kerbing & Edging

Kerbing & Edging

Installing borders to roads and pavements for safety and aesthetic appeal.

Road Construction / Car Parks

Road Construction / Car Parks

Implementing full road/car park construction to provide enhancement and amenities to developments and community areas.

Hard Landscaping / Paving

Hard Landscaping / Paving

A range of finishes to provide suitable surfaces for pedestrian and vehicular use.

Asset Management & Maintenance

Asset Management & Maintenance

Overseeing infrastructure to ensure it remains in good condition and functions effectively.

Section 278 Works (Highways)

Section 278 Works (Highways)

Implementing improvements or changes to public highways as part of development works.

Require Our Services?

Enquire Today

Turkey Street Bridge

This project was part of the Enfield to Broxbourne Greenway Cycle Scheme. The brief was to transform an existing vehicle bridge to pedestrian only.

Services Provided -

Resin-Bound Gravel Surfacing

Bollards

Asphalt Surfacing

Value:

Duration:

Location:

£35k

1 Week

Enfield, London

St John Scurr Primary School

The client reached out to Julian Paving to re-surface over 2500m2 of playground completed over 2 phases to tie in with the school holidays. The aim was to improve the existing drainage issues and provide a fresh aesthetic appearance with the introduction of play line markings. 

Services Provided -

Drainage

Asphalt Surfacing

Line Marking

Value:

Duration:

Location:

£100k

2 Weeks

Tower Hamlets, London

Sloane Street

This project is a public realm scheme on Sloane St situated in Royal Borough of Kensington & Chelsea.

Services Provided -

Civil Engineering

Yorkstone Paving

Granite Kerb

RC concrete foundations

Grante Planters and cladding

Resin Bound gravel to tree pits.

Value:

Duration:

Location:

£2.2 million

24 Months

Kensington & Chelsea

London School of Economics

This project was a public realm scheme in the heart of London commissioned by LSE to improve accessibility and provide green space areas with seating for the public.

Services Provided -

Groundworks

Hard/Soft Landscaping

RC concrete planters with granite cladding façade

Value:

Duration:

Location:

£450k

4 Months

Holborn