Environment

Julian Paving Ltd is a professional and environmentally conscious company. We acknowledge the impact that our operations may potentially have on the environment and realise that the work we undertake and our related activities, if not managed correctly can be hazardous to the environment.

We are therefore committed to conducting our operations in an environmentally responsible manner, to protecting the environment and achieving the highest standards of environmental care in all our undertakings and in doing so will comply with all current legislation.

The clear objective of Julian Paving Ltd is to minimise any impact on the environment by:

  • Preventing pollution, reducing waste and ensuring wherever practical measures are implemented to protect and preserve natural habitats, flora and fauna.
  • Considering the effects that our operations may have on the local community.
  • Taking action to eliminate or reduce as far as practicable, any potentially adverse environmental impacts.
  • Seek to work in partnership with the community by behaving in a considerate and socially responsible manner.
  • Conducting our activities in a considerate manner.
  • Adopting the waste hierarchy of prevention, reduction, reuse, recycling and responsible disposal.
  • Ensure effective and expedient incident control, investigation and reporting.
  • Demonstrate a strong sense of responsibility for people and the environment and ensure that this policy is communicated and implemented at all levels within the Company and to external contractors.
  • Commit ourselves to continuous improvement of our environmental performance by setting of objectives and targets, against which our environmental performance can be measured
  • Comply with and, where appropriate, exceed legislative and regulatory requirements, applying, where feasible, best available techniques in minimising the environmental impacts of our activities.
  • Promote the correct and appropriate manufacture and use of plant and equipment to minimise pollution and risks.
  • Develop and manage activities which make efficient use of energy and raw materials and minimise emissions to air, water and land.
  • Minimise waste and ensure the safe destruction or disposal of production waste, where reuse or recycling are not practicable.
  • Emphasize the care for the environment in our selection of suppliers.
  • Demonstrate openness in environmental questions and liaise on a continuous basis with the local community and other interested parties as necessary.
  • Work actively to increase Company awareness of environmental issues and the significance of our impacts on the environment, as well as encourage employee’s involvement in environmental work.


Julian Paving Ltd will take all practical steps to ensure that potential hazards and risks to the environment are identified and that suitable and effective preventative and control measures are implemented. All employees will be provided with the necessary resources, equipment, information, instructions and training to fulfil these requirements.

Enquire Today

Turkey Street Bridge

This project was part of the Enfield to Broxbourne Greenway Cycle Scheme. The brief was to transform an existing vehicle bridge to pedestrian only.

Services Provided -

Resin-Bound Gravel Surfacing

Bollards

Asphalt Surfacing

Value:

Duration:

Location:

£35k

1 Week

Enfield, London

St John Scurr Primary School

The client reached out to Julian Paving to re-surface over 2500m2 of playground completed over 2 phases to tie in with the school holidays. The aim was to improve the existing drainage issues and provide a fresh aesthetic appearance with the introduction of play line markings. 

Services Provided -

Drainage

Asphalt Surfacing

Line Marking

Value:

Duration:

Location:

£100k

2 Weeks

Tower Hamlets, London

Sloane Street

This project is a public realm scheme on Sloane St situated in Royal Borough of Kensington & Chelsea.

Services Provided -

Civil Engineering

Yorkstone Paving

Granite Kerb

RC concrete foundations

Grante Planters and cladding

Resin Bound gravel to tree pits.

Value:

Duration:

Location:

£2.2 million

24 Months

Kensington & Chelsea

London School of Economics

This project was a public realm scheme in the heart of London commissioned by LSE to improve accessibility and provide green space areas with seating for the public.

Services Provided -

Groundworks

Hard/Soft Landscaping

RC concrete planters with granite cladding façade

Value:

Duration:

Location:

£450k

4 Months

Holborn